3.7
Check the direction of pump rotation
Risk of injury. You must ensure that the direction of rotation of the pump is correct before you
operate the pump. If the pump direction of rotation is incorrect, the inlet pipeline will be
pressurised and may be damaged.
Risk of injury. The coupling cover must be replaced before continuing commissioning.