Table of Contents

Advertisement

Operation Manual – "R" Units

SELECT TESTS

In this screen, the user can select which Tests to perform. In addition, the user is
informed if the MACC will also perform.
Consider unselecting RSP and NOP if there is no RSP Adapter installed.
From the Options Button, the user can select to enter Manual Mode.
Test plan meanings:
R2LC: resistance, inductance capacitance test.
ANOP: automatic nozzle opening pressure test (only with RSP sensor)
RSP: injector nozzle response test (only with RSP sensor)
IVM VL: full load injection measurement test
IVM EM/TL: part load / emissions injection measurement test
IVM LL: low load/ idle speed injection measurement test
IVM VE: pre/post injection measurement test
LKT: static backleak measurement test
NLT: measure the Nozzle Injector Leak
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents