Operation Manual – "R" Units

Commissioning

Installation

Once unpacked, install the unit on a steady, leveled bench that can support its weight.
Some surrounding space should be free for better ventilation and maintenance.

Electrical Connections

INFO: Reference the Rating Plate on the rear of the unit, and technical specifications
section.
1. Switch off the unit
2. Connect the power cord to the unit
3. Connect the other end of the cord to a live and grounded outlet.

Compressed Air Connections

INFO: Reference the Rating Plate on the rear of the unit, and technical specifications
section.
ALWAYS: Adhere hose length and diameter, and compressor capacity according to the
specifications.
ALWAYS: Purify the air coming to the unit, so it is free of water, oil and particles.
1. Close the air supply from the compressor
2. Connect the necessary hose connector (not in scope of delivery), on the rear of
the machine (if required)
3. Connect and secure the Air Supply hose on the machine connector
4. Open the air supply from the compressor.

Attachment Unit Connections

The Attachment units are usually self-powered and do not need to be connected to an
external outlet. However, the Attachment unit need 1 or more connections to the main
unit for Electrical signals and Hydraulic. The Electrical connections for Injector pulse,
RSP and BIP use extension cables from the Main Unit.
A list of common connection diagrams is shown below: