Table of Contents

Advertisement

Operation Manual – "R" Units

CFL 1/2/3

The Connection / Leaks screen, help the user with 3 steps to assure the following:
1. Correct connections
2. Component is capable of testing and it is not damaged severely
3. Machine is capable to test the component
Specifically, Step 1/3 applies a low pressure in order to diagnose basic, immediate
leaks. Step 2/3 applies maximum component pressure to assure no leak is present.
Step 3/3 applies the maximum pressure again but with the component operating, in
order to check for machine capability, component operation and adapter leak. The last
step can also be used to clear lines and adapters from air.
Advanced users can Skip these steps, although it is not advised for correct operation.
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents