Aerotech AGV-HP Series Hardware Manual page 22

2-axis galvo scanner
Hide thumbs Also See for AGV-HP Series:
Table of Contents

Advertisement

2.1. Unpacking and Handling the Scan Head
Before operating the AGV-HP(O), it is important to let it stabilize outside of the shipping case at room
temperature for at least 12 hours. Allowing it to stabilize to room temperature will ensure that all of the
alignments, preloads, and tolerances are the same as they were when tested at Aerotech. Use compressed
nitrogen or clean, dry, oil-less air to remove any dust or debris that has collected during shipping.
Each AGV-HP(O) has a label listing the system part number and serial number. These numbers contain
information necessary for maintaining or updating system hardware and software. Locate this label and
record the information for later reference.
22
AGV-HP(O) Hardware Manual
www.aerotech.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agv-hpo seriesAgv-14 hpAgv20 hpo

Table of Contents