Start Up Procedure - Ultra Optics MR3 Standard Operating Procedure

Coating machine
Table of Contents

Advertisement

Start Up Procedure

AIR:
Slowly press the orange rocker on the air
valve to the down position to supply air to
the machine.
The valve is located on the left side of the
machine.
Check air pressure regulators inside the front door.
Left 80 PSI | Right 60 PSI
POWER:
Press the red rocker switch, just to the left
of the touchscreen, to the ON position.
WATER:
Empty the water buckets and wipe out
with 90% IPA or bleach, weekly to kill any
algae and bacteria.
Fill the clean water bucket with deionized
water that is 1MΩ or better.
After refilling the buckets, prime the wash
pump.
Refer to page 23
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Otb

Table of Contents