Cable Assembly - Weider WESY13820 User Manual

Weider user's manual 950 weight system wesy13820
Table of Contents

Advertisement

CABLE ASSEMBLY

8. Refer to the CABLE DIAGRAM on page 18 for
proper cable routing.
Locate the High Cable (35). Route the eyelet
end of the Cable up through the Top Frame (5)
and around a Pulley (39). Attach the Pulley
inside the Top Frame with an M10 x 65mm Grade
5 Bolt (73), two M10 Washers (55), two M10
Spacers (74), and an M10 Nylon Locknut (56).
9. Wrap the High Cable (35) around a Pulley (39).
Attach the Pulley and a Cable Trap (41) inside
the bracket on the Top Frame (5) with an M10 x
48mm Bolt (77) and an M10 Nylon Locknut (56).
Be sure the Cable Trap is oriented to hold the
Cable in the groove of the Pulley.
10. Route the High Cable (35) down through the Top
Frame (5) and around a Pulley (39). Attach the
Pulley and a Cable Trap (41) to the second set of
holes from the top of the two Pulley Plates (14)
with an M10 x 48mm Bolt (77) and an M10 Nylon
Locknut (56). Be sure the Cable Trap is turned
to hold the Cable in the groove of the Pulley.
8
9
39
77
5
10
5
35
77
8
35
56
5
39
74
55
74
55
73
41
35
56
39
41
56
14

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

950

Table of Contents