Download Print this page
tousek FOLD 330/L Connection And Installation Manual
tousek FOLD 330/L Connection And Installation Manual

tousek FOLD 330/L Connection And Installation Manual

Folding gate operator

Advertisement

Quick Links

Connection and installation guide
Folding gate operator FOLD 330/L-R

Advertisement

loading
Need help?

Need help?

Do you have a question about the FOLD 330/L and is the answer not in the manual?

Questions and answers

Summary of Contents for tousek FOLD 330/L

  • Page 1 Connection and installation guide Folding gate operator FOLD 330/L-R...
  • Page 2: Maintenance

    • Maintenance has to be carried out according to the gate builder`s/installer`s instructions. This manual is the sole property of the TOUSEK Ges.m.b.H. and may not be made available to competitors. All rights reserved. No part of it may be reproduced without our prior written permission.
  • Page 3: General Information

    • General features The operator TOUSEK 330 consists of a massive aluminium block with a closed electrohydraulic system. Due to its precise design and construction the oil pump is extremely quiet. The operator FOLD 330 is to be mounted on the gate leaf. It is therefore also ideal for subsequent installation.
  • Page 4 Dimensions in mm Before mounting: With the Tousek 300 you can automatize a bi-fold gate. Before mounting the motor, please make sure that the gate is sturdy and torsion free. Please notice that the hinges (1 and 2) have to be as free of tension and play as possible and that the second door leaf has to have a roller guide (3).
  • Page 5 If necessary shorten the telescopic arm (both: forming tube and flat iron) To avoid tensions, when in the retracted state, the lenghts of the telescopic arm has to be approx. 5cm shorter than the lenght mentioned above. - 5 - tousek / E_FOLD330_43300306 / 31. 07. 2019...
  • Page 6 (on the front of the automation) and turn it up to the end in a counterclockwise direction. The automation is now unlocked and can be moved manually. To restore the working condition simply turn the key clockwise up to the end. - 6 - tousek / E_FOLD330_43300306 / 31. 07. 2019...
  • Page 7 Release with bowden cable Folding gate operator FOLD 330/L-R Bowdencable L = 3500mm 70mm For emergency release pull the lever upwards - 7 - tousek / E_FOLD330_43300306 / 31. 07. 2019...
  • Page 8: Warning Notices

    We refer to the machinery Directive as well as accident prevention regulations EC and national standards in their current version. The TOUSEK Ges.m.b.H. cannot be held liable for any claims resulting from disregards of the laws and standards in force during the installation and operation.
  • Page 9: Dimensioned Drawing

    Dimensioned drawing Folding gate operator FOLD 330/L-R (right operator) FOLD 330/R Dimensions in mm We reserve the right to change dimensions and technical specifications without prior notice. - 9 - tousek / E_FOLD330_43300306 / 31. 07. 2019...
  • Page 10 • Depending on the mounting position of the drive, the rail profile (3) must then be mounted! • Before attaching the drive arm (2), turn the drive shaft in the unlocked state until it stops (FOLD 330/L (1L) → to the right or FOLD 330/R (1R) → to the left) and then approx. 5 ° back in the opposite direction! •...
  • Page 11 Date/ Signature TOUSEK Ges.m.b.H., A1230 Wien, Zetschegasse 1, Austria is authorized to compile the technical documentation. The incomplete machine cannot be put into service, until it...
  • Page 12 Buitenheide 2A/ 1 Tel. +32/ 11/ 91 61 60 your service partner: Fax +32/ 11/ 96 87 05 info@tousek.nl Tousek Sp. z o.o. Poland PL 43-190 Mikołów (k/Katowic) Gliwicka 67 Tel. +48/ 32/ 738 53 65 Fax +48/ 32/ 738 53 66 info@tousek.pl...

This manual is also suitable for:

Fold 330/r1141001011410020