Operator's Manual ROTAX 125 MAX evo, Junior MAX evo, Mini MAX evo, Micro MAX evo
tear-down inspection of engine
Page 56/58
Inspection
of
the
components
after
every
hours
of
operation:
piston pin and piston bearing
cage,
conrod
and
bearing,
main
bearings
crankshaft, drive of balance
shaft, sealing of water pump
shaft.
following
Tear-down inspection must be
50
conducted by an authorized
piston,
distributor.
Renew worn parts as required.
conrod
of
Edition 09/2016