InStaLLatIOn
Preparing for installation
f On cylinders supplied horizontally, insert the bottom thermal
f
insulation section inside the support ring, prior to position-
ing the cylinder. Slightly tip the vertically delivered cylinder
in order to position the bottom thermal insulation section.
f Surround the support ring with the bottom thermal insula-
f
tion ring and secure it with adhesive tape.
f Remove the foil from the 5 foam strips (convection brakes)
f
and stick them around the cylinder in the positions shown.
f Prior to fitting them, shape the right hand and left hand ther-
f
mal insulation sections into a semi-circular form for approx.
10 seconds. A pressure-activated adhesive then holds the
thermal insulation sections in the required shape and makes
fitting them easier.
Please note that the use of tensioning straps may damage the
thermal insulation.
f Push the thermal insulation sections over the connections on
f
the appliance.
f Connect the thermal insulation sections at the front by clip-
f
ping the hook closure strip into the last hook strip. If neces-
sary, the short black cover strips can be used to temporarily
hold the hook closure strips together.
f Position the thermal insulation sections around the cylinder
f
and connect the thermal insulation sections at the back by
clipping the hook closure strip into the first or second hook
strip.
f Adjust the thermal insulation sections on the appliance by
f
patting and pressing them down with the palm of the hand.
f Starting from the top, retighten the hook closure strip from
f
the top until it hooks into the final hook strip.
f Place the thermal insulation ring and the two thermal insula-
f
tion sections on the top.
f Place the cover over the thermal insulation sections.
f
f Fit the cover strips onto the hook closure strips. If required,
f
the cover strips can be trimmed to size.
f Fill the hollow spaces near the connections with the soft
f
foam inserts.
f Push the roses and caps into the apertures.
f
Note
Affix the additional type plate in a clearly visible position
on the thermal insulation.
www.stiebel-eltron.com
9.2

installing the manual air vent valve

f Install a manual air vent valve at the air vent valve
f
connection.
9.3

Fitting the temperature sensor

f Fill the protective pipe with heat conducting paste.
f
f Insert the sensor into the protective pipe until it bottoms.
f
Prior to inserting contact sensor AVF 6 into the protective pipe,
bend the bias spring forward.
9.4
where appropriate, fit the flanged or threaded
immersion heater.
f Remove the dummy flanges and plugs in order to mount
f
the heat exchanger, flanged or threaded immersion heater.
Maintain the DC separation towards the cylinder.
SBP 1000-1500 E | E SOL | E cool |
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbp 1500 eSbp 1000 e solSbp 1500 e solSbp 1000 e coolSbp 1500 e cool

Table of Contents