Accessing the INFO menu from the main page of the interface it is possible
of hours that have passed since the activation of the function.
Once activated, the function takes priority, if the machine is shut down by
disconnecting the power supply, when it is restarted the function picks up
from where it was interrupted.
menu
CH.
Note: The temperature and increase values can be set to different values
declines all responsibility if the parameters are incorrectly set.
DAY
TIME
1
0
6
12
18
2
0
12
3
0
4
0
5
0
6
0
7
0
4.16
After starting up, check that the boiler carries out the start-up procedures
and subsequent shut-down properly.
Check the domestic hot water operation by opening a hot water tap in
Check the full stop of the boiler by turning off the system's main switch.
After a couple of minutes of continuous operation, which can be
obtained by turning the system's main switch to "on", setting the boiler
device, the binders and manufacturing residues evaporate and it will be
possible to carry out the check of the combustion.

4.17 Combustion check

To carry out the combustion analysis, proceed as follows:
set the boiler to the OFF status by pressing button 1
activate the combustion control function by pressing buttons 2+3 for at
least 2sec
+
HEATING value regarding the number
TEMPERATURE
20°C
22°C
24°C
26°C
28°C
30°C
32°C
35°C
35°C
30°C
25°C
+
RESET
MENU
2
3
,
,
and
come on:
pressing
interrupts the operation
using the
,
keys it is possible to change the speed of the fan
the number of revs set, together with the rpm icon, are shown on the
display for 10sec.
b
With the OT device connected it is not possible to activate the
disconnect the OT connection wires and wait 4 minutes, or else cut
off the electrical supply and reconnect power to the boiler.
b
The combustion analysis function is normally carried out with the
three-way valve positioned on heating. It is possible to switch the
valve to domestic hot water generating a domestic hot water heat
request at maximum output while the function itself is being carried
out. In this case the temperature of the domestic hot water is limited
The boiler will operate at maximum heating output and it will be possible to
regulate the combustion.
Insert the analysis probe adapter (
envelope, into the hole for the combustion analysis.
Control the combustion, checking that the CO
the table.
When the control is completed, remove the analyser probe and close the
combustion analysis sockets with the relative plugs and screw.
Put back and keep the analysis probe adapter supplied with the boiler in
the documentation envelope.
b
If the value displayed is different to that shown in the technical data
VALVE, ask assistance from the Technical Assistance Centre.
b
The gas valve DOES NOT need adjusting and any tampering with it
causes the boiler to operate irregularly or even not at all.
b
When the combustion analysis is in progress all heat requests are
inhibited and a message is shown on the display.
ENGLISH
A-B
) located in the documentation
D
values match those in
2
A
D
B
).
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Residence 25 kisResidence 30 kisResidence 35 kis

Table of Contents