Checking Before Installation; Checking The Installation Space; Check Items When Turning Off The Main Power; Points To Note Before Installation - Canon Paper Folding Unit-J1 Service Manual

Revision 3.0
Table of Contents

Advertisement

Checking before Installation

Following shows requirements for the installation site.
Therefore, it is desirable to see the installation site in advance before bringing in this equipment to the user's site.

Checking the Installation Space

The following illustration describes the necessary space for the maintenance.

Check Items when turning OFF the Main Power

Check that the main power switch is OFF.
1. Turn OFF the main power switch of the host machine.
2. Be sure that control panel display and main power lamp are both turned OFF, and then disconnect the power plug from the
outlet.

Points to Note before Installation

When installing the machine, be sure to note the following points.
• Refer to "Order of Installation of options" when installing this equipment.
• The weight of this equipment is approx. 71kg. Be sure to work in a group of 2 persons or more.
• When moving this equipment after having unpacked it, be careful by placing a plate, etc. on areas with steps to prevent the
casters from hitting those steps. If the casters hit a step, the casters or the base plate may be deformed.

Installation Order of Options

When installing the equipment with other options, install the host machine first and then install options in the following order:
800 mm or more
1355 mm
500 mm or more
109
6. Installation