Installation instructions
3.2.4 Water
Water connections are made by qualified personnel in a way that complies with
local and national regulations. The machine's capacity requirements are stipulat-
ed in TECHNICAL SPECIFICATIONS.
3.2.5 Steam (optional)
Steam connections are made by qualified personnel in a way that complies with
local and national regulations. The machine's capacity requirements are stipulat-
ed in TECHNICAL SPECIFICATIONS.
3.2.6 Drain/waste pipe
There must be a waste pipe with an effective trap for the machine's waste water
and for water used for rinse cleaning. The machine's capacity requirements for
drainage are stipulated in TECHNICAL SPECIFICATIONS.
3.2.7 Space for servicing
A 1-metre area should be left clear in front of the machine for servicing purposes.
Depending on if the machine has different accessories, there may also be such a
requirement at the infeed and outfeed ends as well as above the machine.
WD-ACS 47D
9
Rev. 1.0 (202003)