Installing The Discharge Tubes; Lower Tube; Bolt, (#10 X 3/4 Inches); Locknut, (#10) - Toro 78534 Operator's Manual

60 and 72in triple bagger for z500 series z master mowers
Hide thumbs Also See for 78534:
Table of Contents

Advertisement

Figure 19
1. Indentations for drilling
holes
2. Upper tube
3. Cut off 3–1/2 inches (89
mm) for 60 inch mowers
with gas engines only
Step
8
Installing the Discharge
Tubes
Parts needed for this step:
1
Upper tube
1

Lower tube

3

Bolt, (#10 x 3/4 inches)

3

Locknut, (#10)

3

Washer, (7/32 inch)

Procedure
Important: Make sure the mower deck
is in the lowest height-of-cut position while

installing the discharge tubes.

4. Use the existing holes to
create a line
5. Line to cut tube
Note: Remember to replace the grass deflector
when the bagger is removed from the mower.
Refer to Replacing the Grass Deflector.
1. Disengage the PTO and set the parking brake.
2. Stop the engine, remove the key, and wait for
all moving parts to stop before leaving the
operating position.
3. Lower the mower deck to the lowest
height-of-cut position.
4. Remove the bags for viewing the tube under
the hood.
5. Install the upper tube into the bagger opening
and pull it back out so the rubber seal is
protruding out (Figure 20).
Figure 20
1. Upper tube
2. Bagger opening
6. With the hood in the down position, measure
the distance the tube is inside the hood.
Measure from the hood plate to the edge of
the tube as shown in Figure 21. This distance
needs to be 3/4 inch (19 mm).
14
3. Bagger hood

Advertisement

Table of Contents
loading

This manual is also suitable for:

78535

Table of Contents