Toro 78534 Operator's Manual page 16

60 and 72in triple bagger for z500 series z master mowers
Hide thumbs Also See for 78534:
Table of Contents

Advertisement

9. Slide the lower tube onto the boot and latch
them together (Figure 24).
Note: There is a latch on the top and bottom
of the blower housing.
Figure 24
1. Blower assembly
2. Lower tube
10. Make sure the mower deck is in the lowest
height-of-cut position.
11. Check to make sure the mark fromFigure 22 is
still in place.
12. Using the three holes or indentations in the
upper tube as a template, drill three holes (7/32
inch diameter) where the upper and lower
tubes join together (Figure 25).
3. Latch
Figure 25
1. Bagger hood
2. Upper tube
3. Drill 7/32 inch diameter
holes here (use upper tube
as a template)
13. Remove the lower tube from the blower.
14. Join the upper and lower tubes with 3 bolts
(#10 x 3/4 inches), 3 flat washers (7/32 inch),
and 3 locknuts (#10) (Figure 26).
16
4. Lower tube
5. Blower assembly

Advertisement

Table of Contents
loading

This manual is also suitable for:

78535

Table of Contents