Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
1
2
mowers only)
3
4
Clevis pin
Hairpin cotter pin
5
6
Drive Kit)
7
Upper tube
8
9
Kit)
10
11
12
No parts required
Description
6
Qty.
-
Prepare the mower.
1
2
2
14
Install the bagger mounting bracket
2
14
14
-
Tighten all mounting bolts
1
3
Install the hood assembly and bags.
2
2
Route the bagger belt into the
1
blower assembly.
1
Install the blower assembly.
1
Size the upper tube for 60 inch
1
mowers with gas engines.
1
1
3
Install the discharge tubes.
3
3
Install the belt cover.
2
2
4
4
Install the weights.
2
2
2
-
Adjust the parking brake.
-
Check the tire pressure.
Use