Cortex Omega CUKR-10 Owner's Manual page 9

Assisted chin up tower with knee raise and dip
Table of Contents

Advertisement

Step 2
1. Pre lock the Weight frame (7) to the Upper horizontal frame (3) with the Bolt (44), Flat washer
(36), Base plate (14) and Nylon nut (37).
2. Pre Lock the Upper connecting frame (2L/R) to the Main frame (1L/R) and Upper horizontal
frame (3) with the Bolt (35), Flat washer (36), and Nylon nut (37).
3. Lock all the screws tightly.
- 8 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Omega CUKR-10 and is the answer not in the manual?

Table of Contents