2.10 Probe Preparation

Figure 18
Chlorine Probe Exploded View

2.11 New Membrane Pre-qualification Testing

Page 24
Probe Preparation
4000 ft. (Max.)
1
1
2
2
3
3
4
4
Prior to operating the system, the chlorine probe must be prepared for use.
Preparation includes disassembly of the probe to install a new membrane and
to fill the probe with electrolyte. An exploded view of the chlorine probe is
provided in
Figure
Threaded Membrane Cap
Membrane
Membrane O-ring
The membrane used for the free chlorine probe must be checked for
absorbency prior to its installation.
1. Fill a cup with tap water.
2. Using tweezers, gently place a membrane on top of the water surface,
being careful not to immerse the membrane. The membrane must float on
top.
TB6 (Instrument #N)
TB6 (Instrument #N – 1)
18.
Probe Tip
Probe Body
Fill Screw
Probe O-ring
and O-ring
Probe Canister
Silver Anode
1
2
3
4
1
2
3
4
Probe Body
Screws (3)
16116Install.fm

Advertisement

Table of Contents
loading

Table of Contents