Section 2 Installation; Overview; Monitor Mounting; Wall Mounting - Hach 8450 Instrument Manual

Residual free chlorine monitor
Table of Contents

Advertisement

Section 2

2.1 Overview

2.2 Monitor Mounting

2.2.1 Wall Mounting

Figure 2
Monitor with Wall Mount Brackets
Figure 3
Wall Mount Brackets (Rear View)
16116Install.fm
Installation
Installation of the residual chlorine monitor consists of mounting and wiring
the monitor, pipe-mounting the probe (for submersion applications), and
connecting sample and drain lines for applications requiring flow cell usage.
Connect the probe to the electronics module by plugging the probe multi-pin
plug into the receptacle at the bottom of the electronic module.
The programmable electronic monitor is enclosed in a NEMA-4X enclosure
that can be mounted to a wall, through a panel, or onto a handrail or pole.
Two mounting brackets (one on each side) are attached to the monitor with
four screws (supplied). With the bracket tabs and mounting holes extending
beyond the monitor on each side, the monitor can be attached to a wall or flat
surface using four [need size] screws and appropriate mounting hardware.
9.75" (24.8 cm)
8.75" (22.2 cm) c-c
8.4" (21.3 cm)
RESIDUAL CHLORINE MONITOR
Page 11
Installation

Advertisement

Table of Contents
loading

Table of Contents