CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off the
electrical current supplied to the device. The device also might have more than one power cord. To
remove all electrical current from the device, ensure that all power cords are disconnected from the
power source.
"
CAUTION:
Make sure that all server power cords are disconnected from their power sources before performing
this procedure.
Before you install an adapter in slot 10 to 15, make sure that there is no filler installed in the slot where you
are installing the adapter.
Important: You must remove the riser from the I/O tray before installing an adapter. If you are installing a
network adapter (with an RJ45 connector), make sure that there is sufficient clearance to disconnect the
Ethernet cable from the adapter after it is installed.
Note: If you are installing an adapter in slot 14 or 15, the slot 14 to 15 riser bracket or a riser bracket filler
must be installed on the riser. See "Install the riser bracket for slot 14 to 15 (riser 2)" on page 221
Complete the following steps to install an adapter in slot 10 to 15.
Watch the procedure. A video of the installation process is available:
YouTube
Youku
Figure 51. Adapter installation (slot 10 to 15)
Step 1.
Open the retention latch.
Step 2.
Align the adapter with the riser slot and insert it; then, press the adapter into the riser until the
connector is fully seated.
Step 3.
Close and lock the retention latch.
If you have no other operations to perform on the riser after installing an adapter in slot 10 to 15:
1. If any of the adapters in the riser have internal cables, make sure that they are connected before
installing the riser in the I/O tray.
2. Install the riser in the I/O tray. See "Install the riser for slot 1 to 4 (riser 1)" on page 218.
3. Install the I/O tray in the chassis and connect all cables. See "Install the I/O tray" on page 154.
" on page 89 "
" on page 65
.
Chapter 9
Hardware replacement procedures
103

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile vx 4-socket 4u certified node

Table of Contents