Mcs Controllers; Mcxs Controllers; Mcxs Power-Up Sequence - Davey microlene MCS Installation And Operating Instructions Manual

3 stage uv filtration
Hide thumbs Also See for microlene MCS:
Table of Contents

Advertisement

MCS Controllers

Simplistic in operation, these systems feature a tri-colour LED that
indicating system status and a 4-digit display to indicate lamp life
remaining. Pressing the button will change the display to indicate total
running time. When the UV lamp is on and within its operating age,
the LED will be green. When the UV lamp is not on or the lamp life has
expired, the LED will be illuminated red and an audible buzzer will be
sounding. To remedy this condition, the UV lamp must be replaced with a
new genuine Microlene UV lamp.

MCXS Controllers

A full colour LCD screen provides the user with a detailed description
of the system's performance in addition to providing any applicable
fault messages and system diagnostics. The controllercan be used as
both a non-monitored and UV monitored system. If a true UV monitor
is required, simply add the optional UV sensor module to the "infinite
expandability port" located on the right side of the controller. Simply
plug in an optional UV sensor module into the expandability port of a
Microlene controller and the system will now monitor the UV intensity of
the system!

MCXS Power-up Sequence

On start up, the controller will run through a diagnostic start-up and the sequence will
be dis-played as follows on the colour LCD:
Next, the controller checks for and initializes any optional modules that may be
attached to the system.
UV Sensor
Module Check
Solenoid
Module Check
14
OR
OR

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the microlene MCS and is the answer not in the manual?

This manual is also suitable for:

Microlene mcxs

Table of Contents