Maintenance - DAL-BO Frontflex 2000 Series Manual

Table of Contents

Advertisement

Fig. 12
Crackerboard

Maintenance

Tighten all nuts, bolts, or any other fastened assemblies after the first work-
day. It is important that the bolts on which the Crackerboard is hinged (Fig.
13, A) are properly tightened so the Crackerboard can move freely when
changing the angle. (The nuts are self-tightening). Check all nuts, bolts and
fastened assemblies regularly and tighten when necessary.
Fig. 13
side 16
Frontflex 2000
A
1. Mount the telescoping brackets (A) behind the front tube of the main
frame. Mount the middle telescoping piece halfway between the spac-
ing piece and the towing eye (B).
2. Attach the mounting plates (C) to the threaded spindle shafts. Fasten
the nuts. Only the two spindles on the outside adjust the depth. The
middle telescoping piece is mounted without a spindle and a different
mounting plate is used.
Model
150
300
A
B
Weight
Number of
115
175
B
C
Tines
18
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Frontflex 2000 150 cmFrontflex 2000 300 cmFrontflex 2000 400 cm

Table of Contents