Horizontal Termination - Jøtul Lillehammer Installation And Operation Instructions Manual

Direct vent gas stove pilot-on demand ignition
Table of Contents

Advertisement

139955-01 GF 200 DVII MV / Sept. 2019
Horizontal Vent Termination
Wall Cut-out Opening: Cut-out dimensions will
vary pipe. Follow the specific vent manufacturer's
instructions. Code standards require 2" clearance to
combustible materials above the vent pipe and 1"
clearance around the sides and bottom. Use one of the
approved vent manufacturers' WALL THIMBLE for the
wall penetration.
DO NOT FILL AIR SPACE WITH ANY TYPE OF INSULATION.
The minimum horizontal run made directly off the rear
of the stove into a standard horizontal cap shall be no
less than a 6" (152 mm) vent section. See fig. 11.
The maximum horizontal run made directly off the rear
of the stove into a standard horizontal termination
must not exceed 4 ft. (1219 mm) See fig. 11.
Corner Installation: Max. Horizontal Run is 2 ft. (610
mm). See Fig. 12.
A horizontal termination must fall within the shaded
area illustrated in fig. 7, Vent Termination Diagram.
The horizontal termination cap must maintain a 3"
clearance to any overhead combustible projections
2 1/2" or less. It must also maintain 12" clearance from
projections exceeding 2 1/2". See fig. 14.
Any horizontal run of vent must be level or have a
1/4" rise for every foot of run toward the termination
cap. NEVER ALLOW THE VENTING TO RUN DOWNWARD
FROM STOVE TO TERMINATION; DOWNWARD VENT
RUNS TRAP HEAT AND CAUSE HIGH TEMPERATURES TO
DEVELOP WITHIN THE VENT THAT COULD START A FIRE.
Install a Vinyl Siding Standoff between the vent termi-
nation and an exterior wall covered by vinyl siding ma-
terial to prevent potential heat damage to the siding.
Do not recess the termination cap into a wall or siding.
12
Zero
Clearance
to Rear
Figure 11. Min. / Max. Horizontal Run
Figure 12. Corner Installation, Horizontal Termination
directly off rear. Maximum Horizontal run is 2 ft. (610 mm).
Decorative
Wall Shield
Included
Min. 6 in.
Max. 48 in.
Horizontal Run
Standard
Horizontal
Termination

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gf 200 dv ii mvGf 200 dv ii mv lillehammer

Table of Contents