1 Device series
1.1 Checking the Delivery
→
Before opening the package, please check the nameplate on it
to make sure that you received the correct connection.
Your fieldbus connection was carefully packaged and handed over for
shipment. The devices should be shipped only in their original packaging with
suitable transportation materials. Please observe the labels and instructions
on the packaging and for handling the unpacked device.
▶
Open the packaging with adequate tools and inspect the contents
immediately after receipt in order to ensure that they are complete and
undamaged.
The packaging must contain the following parts:
•
a DX-NET-DEVICENET fieldbus connection
•
the instruction leaflet IL040004ZU.
N S
M S
D e vi c e N e t
Figure 1: Equipment supplied with fieldbus connection DX-NET-DEVICENET
DX-NET-DEVICENET 02/14 MN04012005ZEN www.eaton.com
1 Device series
1.1 Checking the Delivery
7
Need help?
Do you have a question about the PowerXL DX-NET-DEVICENET and is the answer not in the manual?