Download Print this page

Cisco 6100 Installation Procedures Manual page 26

Thermal upgrade kit

Advertisement

Installing the Cisco 6100 Thermal Upgrade Kit
Ground the Fan Tray
Complete the following steps to connect the grounding lug on the fan tray directly to the rack:
Remove all paint or oxidation from the rack at the point of the grounding connection.
Step 1
Measure enough wire (14 AWG or thicker green or green with yellow stripes stranded copper wire) to
Step 2
connect the fan tray to the rack. (See Figure 10 for grounding wire location.)
Make sure your wire is as short as possible to make the connection.
Note
Use a wire stripper to remove the casing from both ends of the wires.
Step 3
Use a 3/16-inch flat-head screwdriver to loosen the screw on the rack.
Step 4
Hook one end of the copper wire around the screw on the rack.
Step 5
Tighten the rack screw over the copper wire.
Step 6
Loosen the compression screw provided on the grounding lug of the fan tray.
Step 7
The grounding lug
Insert the other end of the copper wire under the compression screw.
Step 8
Step 9
Tighten the compression screw over the copper wire.
Note
Do not ground the components in a rack by chaining them together.
Reconnect the Cisco 6100 to the Cisco 6120
If you disconnected the Cisco 6100 from the Cisco 6120 in the "Disconnect the Cisco 6100 from the
Cisco 6120" section on page 16, connect the Champ cables from the Cisco 6100 (connectors J39
through J44) to the Cisco 6120 (connectors J1 through J6). Table 7 shows the corresponding Cisco 6100
and Cisco 6120 connectors.
Table 7
Cisco 6100
Connector
J39
J40
J41
J42
J43
J44
Cisco 6100 Thermal Upgrade Kit Installation Procedures
26
located in the upper left corner of each chassis (viewed from the rear).
is
Cisco 6100 and Cisco 6120 Corresponding Connectors
Cisco 6120
Connector
J3
J1
J5
J4
J2
J6
78-10158-01

Advertisement

loading