Cisco 6100 Installation Procedures Manual page 40

Thermal upgrade kit

Advertisement

Installing the Cisco 6100 Thermal Upgrade Kit
Tie wrap the transmit and receive cables coming from the system I/O card where the cables meet after
Step 10
coming from the ferrites and every 1 foot thereafter for a total of 15 feet, as shown in Figure 26.
Figure 26
Tie wrap
for 15 ft
Note
Cisco 6100 Thermal Upgrade Kit Installation Procedures
40
Ferrites Close to DS3 BNC Connectors on System I/O Card
Tie
wrap
every
1 ft
Tie
wrap
If you have one subtending host chassis with two subtended node chassis, the
second subtended node chassis connects to the TX2 and RX2 DS3 BNC
connectors on the DS3 subtending I/O card.
DS3 BNC
Ferrite
connector
DS3 BNC
Ferrite
connector
System
I/O card
TX
P1
RX
P2
78-10158-01