Download Print this page

Cisco 6100 Installation Procedures Manual page 2

Thermal upgrade kit

Advertisement

Installation Prerequisites
For additional site requirements, refer to the Cisco 6100 with NI-1 Direct Connect
Note
Installation Guide.
Tool and Equipment Requirements
Table 1 lists the tools and equipment required to install and remove the Cisco 6100 Series
system components.
Table 1
Check
Cisco 6100 Thermal Upgrade Kit Installation Procedures
2
Tools and Equipment Requirements Checklist
Tools and Equipment
Hardware Components
Cisco 6100 Thermal Upgrade Kit.
Fan tray
Fan chassis
Three fans
Air filter
Thermal guard—Required when installing dual-port DMT-2 ATU-C or quad-port flexi
ATU-C modules in the Cisco 6100
Cisco 6100 chassis ventilation cover
New power rating label
Direct Connect configuration already installed in the rack with a Cisco 6100 and
Cisco 6120.
Tools
A 3/16-inch flat-head screwdriver.
A Phillips-head screwdriver.
A one-quarter inch socket driver or wrench.
Necessary equipment for ESD protection—Required whenever you handle Cisco DSLAM
equipment, which includes the chassis, modules, and cards.
Mounting screws—Needed to mount the fan tray to the rack. The fan tray mounting screws
are included in the Cisco 6100 Thermal Upgrade Kit.
Wire wrapping tool.
Wire stripper.
1
78-10158-01

Advertisement

loading