Download Print this page

Cisco 6100 Installation Procedures Manual page 39

Thermal upgrade kit

Advertisement

Attach the end of the cable used in Step 7 to the transmit DS3 BNC connector (TX) for the system I/O
Step 8
card on the subtended node chassis backplane.
Tie wrap the transmit and receive cables coming from the DS3 subtending I/O card where the cables
Step 9
meet after coming from the ferrites and every 1 foot thereafter for a total of 15 feet, as shown in
Figure 25.
Figure 25
78-10158-01
Ferrite Close to DS3 BNC Connectors on DS3 Subtending I/O Card
DS3 subtending
I/O card
P1
TX 1
P3
RX 1
P2
TX 2
P4
RX 2
Installing the Cisco 6100 Thermal Upgrade Kit
DS3 BNC
Ferrite
wrap
connector
DS3 BNC
connector
Ferrite
wrap
Cisco 6100 Thermal Upgrade Kit Installation Procedures
Tie
Tie wrap
every
1 ft
for 15 ft
Tie
39

Advertisement

loading