Maintenance Schedule - Daikin WCT Series Operating & Maintenance Manual

Counter-flow centrifugal chillers with two-stage compressors 2200 to 3250 tons (7750 to 11400 kw) series counter-flow with two-stage compressors 4500 to 6400 tons (15830 to 22500 kw)
Table of Contents

Advertisement

Maintenance Schedule

Maintenance Check List Item
I. Unit
· Operational Log
· Analyze Operational Log
· Refrigerant Leak Test Chiller
· Test Relief Valves or Replace
II. Compressor
· Vibration Test Compressor
A. Motor
· Meg. Windings (Note 2)
· Ampere Balance (within 10% at RLA)
· Terminal Check (Infrared temperature measurement)
· Motor Cooling Filter Drier Pressure Drop
B. Lubrication System
· Lubricant Appearance (clear color, quantity)
- Lubricant Filter Pressure Drop
· Lubricant Analysis (Note 6)
· Lubricant change if indicated by lubricant analysis
III. Controls
A. Operating Controls
· Calibrate Temperature Transducers
· Calibrate Pressure Transducers
· Check Vane Control Setting and Operation
· Verify Motor Load Limit Control
· Verify Load Balance Operation
· Check Lubricant Pump Contactor
B. Protective Controls
· Test Operation of:
Alarm Relay
Pump Interlocks
Guardistor and Surgeguard Operation
High and Low Pressure Cutouts
Lubricant Pump Pressure Differential Cutout
Lubricant Pump Time Delay
Continued on next page.
OMM WCT
O
Centrifugal Chillers
O
O
X
X
O
X
X
O
O
X
X
X
X
X
X
X
X
X
X
X
X
X
D-EOMWC01302-16EN - 77/84
X
X

Advertisement

Table of Contents
loading

Table of Contents