Daikin WCT Series Operating & Maintenance Manual page 31

Counter-flow centrifugal chillers with two-stage compressors 2200 to 3250 tons (7750 to 11400 kw) series counter-flow with two-stage compressors 4500 to 6400 tons (15830 to 22500 kw)
Table of Contents

Advertisement

7. Additional setpoints can be changed by selecting another setpoint on the screen or by selecting an
entirely new group of setpoints.
Explanation of Setpoint Groups
Each of the seven setpoint group of screens are detailed in the following section. In many cases
the setpoint content is obvious and no explanation is included.
1. TIMERS, for setting timers such as start-to-start, Prelube, Postlube, etc.
2. ALARMS, for setting the limit and shutdown alarms.
3. VALVE, sets the parameters for operation of an optional field installed tower bypass valve.
4. TOWER, selects the method of controlling the cooling tower and sets the parameters for fan
staging/VFD.
5. MOTOR, selects motor related setpoints such as amp limits, VFD settings, etc. Also has
maximum and minimum rate of change of chilled water temperature.
6. MODES, selects various modes of operation such as control source, multiple compressors
staging, pump staging, BAS protocol, etc.
7. WATER, leaving water temperature setpoint, start and stop delta-T, resets, etc.
WATER Setpoints
Figure 19, WATER Setpoint Screen
OMM WCT
Centrifugal Chillers
D-EOMWC01302-16EN - 31/84

Advertisement

Table of Contents
loading

Table of Contents