Things to keep in mind when installing the Control Kit on site

When installing the AHU Control Kit on site, if any drilling is required at the top or side, please
observe the following work standards.
- Take precautions to prevent foreign matter, such as chips generated while working, from
entering the unit.
- Once the electrical wiring has been completed, be sure that the perforated areas have been
sealed to be airtight.
- LG Electronics is not responsible for any problems caused by arbitrary drilling.
Correct construction
CAUTION
!
• When perforating the panels, take precautions to prevent foreign matter, such as chips,
from entering the unit. Foreign matter, such as chips, falling onto electrical parts such as
the internal PCB could result in fire or electric shock.
• Once the electrical wiring has been completed, be sure that the perforated areas have
been sealed to be airtight. Dust or moisture entering the Control Kit could result in fire or
electric shock.
• Do not install the power lines or communication lines of external equipment in the Control
Kit's internal duct pipe.
Top perforation
AHU SENSOR CONNECTION
Side perforation