INSTALLATION LAYOUT
6
INSTALLATION LAYOUT
Installation composition diagram
RA
-1
MCC
No.
①
②
AHU CONTROL KIT
③
④
⑤
Pipe in Thermistor(Liquid)
⑥
Pipe out Thermistor(Gas)
⑦-1, 2
Temperature/humidity sensor RA, SA
⑧-1, 2
Ventilation Fan, Supply Fan
⑨-1, 2
Inverter drive kit
⑩
Main power switch board
⑪
Caution on installation layout
- MCC is part of the installation construction to be performed by the equipment supplier, so
confer with the supplier before installing the product.
- Temperature/humidity sensors must be installed on the SA (supply)/RA(ventilation) ducts before
the product can run normally.
EA
OA
-1
-1
-2
Item
AHU
Expansion kit
Outdoor unit
HMI
SA
-2
Applied Standards
PAHCNM000
MULTI V
Sensor : Ø 5(NTC 5 kΩ), Length : 5 m, Cable color : Black
Sensor : Ø 7(NTC 5 kΩ), Length : 5 m, Cable color : Red
Optional
MCC switch board panel
-2
Power cable
Communication cable
Thermistor signal
Temperature /
humidity sensor
-
-
-
-
-