DSA E-Series (E2800 60-bay)
2.
3.
4.
5.
6.
5.5

Supported connections

We recommend using the following connection methods:
Bosch Security Systems B.V.
Connect the two power cords of the controller unit to different power distribution units
in the cabinet or rack.
Note: If you have expansion units, connect the two cords accordingly.
1
1 = Power switch
If you have expansion units, turn on their two power switches first.
Note: Wait for 2 minutes to allow hard disks to spin up before applying power to the
controller unit.
Turn on the two power switches on the controller unit and wait approximately 3 minutes.
Note:
The default IP addresses will take approximately 3 minutes to initialize from the time
the network is attached.
Do not turn off the power switches during the power-on process.
The fans are very loud when they first start up. The loud noise during start-up is
normal.
Check the LEDs and the seven-segment display on the back of each controller.
Note: The seven-segment display shows a repeating sequence (OS, Sd, blank) to indicate
that the controller is performing start-of-day processing. After the controller has started,
the display shows the tray ID.
If any of the amber LEDs are on, there might be a problem with a component. Confirm
you completed the installation steps correctly. If you are unable to resolve the problem,
contact your local Bosch Technical Support team.