Installation Procedure; Parallel Interface Board (Ifau-08*); Figure 5 Parallel Interface Board (Ifau-08*) Installation - Toshiba G9000 Series Installation Manual

Mms kit 480/480 v 80/100/160/225 kva
Hide thumbs Also See for G9000 Series:
Table of Contents

Advertisement

5

Installation procedure

5.1

Parallel Interface Board (IFAU-08*)

IOAU-08*
Wire
metallic plate
G9000 80-225kVA MMS KIT Installation Manual - 94466-000
1.
2.
CAUTION

Figure 5 Parallel Interface Board (IFAU-08*) Installation

Step 1
Step 2
IOAU-08*
Step 3
Clamp
GNDC
Wire
Prior to the installation of the parts, confirm that the AC input breaker, AC output breaker,
Bypass input breaker and DC breaker are turned off. (De-energize the interior of the UPS.)
Then remove the metal cover plates from UPS.
Step 4
metallic plate
Supports
clamp
GNDC
metallic plate
Step 1 :Screw the supports with spring and flat washer
clamp
Step 2 :Install the parallel interface board IFAU-08* on
Step 3 :Install metallic plate to the front door. At this
Front door
metallic plate
Step 4 :Insert all connectors of the multi-conductive
clamp
metallic plate
CN93
CN92
CN96 CN95
CN94
TL
TL
CB
CB
CA
CA
clamp
IN
OUT
IN
OUT
IN
OUT
From TLCR-C*
From other UPS
on the metallic plate. Cable clamp also.
the metallic plate.
time, GNDC on the PCB wires to FG (metallic
plate). This wire is tightened with the screw in
one place.
wires to corresponding connectors on the PCB
by verifying the connector number. Fasten the
cables (IFAU-08* – TLCR-C*) to the Cable
Clamp with binding band.
Front door
band
7

Advertisement

Table of Contents
loading

Table of Contents