5.2
Parallel Control Board (TLCR-C*)
8
Figure 6 Parallel Control Board (TLCR-C*) Installation
Step 1
UPGR-M*
Step 2
UPGR-M*
TLCR-C*
TLCR-C*
CN93
metal plate
Step 3
UPGR-M*
Supports
metal plate
UPGR-M*
CN91
CN92
UPGR-M*
CN91
CN91
TLCR-C*
CN93
CN92
Step 1 :Screw the supports with spring
and flat washer to the metal
plate.
Step 2 :Install the parallel control board
TLCR-C* to the supports.
Step 3 :Insert all connectors of the
multi-conductive wires to
corresponding connectors on
the
PCB
by
verifying
connector number.
G9000 80-225kVA MMS KIT Installation Manual - 94466-000
metal plate
From IFAU-08*
the