Battery Frame Inspection; Realsense Module Inspection - YUNEEC Typhoon H Plus Maintenance, Troubleshooting & Parts

Hide thumbs Also See for Typhoon H Plus:
Table of Contents

Advertisement

BATTERY Frame Inspection

Battery Connector and mount holes
Battery Frame
Guide on
Battery
(which goes
into above
guides)
st
Inspecting frame - pay attention to the areas above - which are the battery guide lugs (circled) and battery connector mount holes (1
picture),
nd
nd
battery attachment points (not broken/loose) (2
Picture) and Battery lock post (3
picture) for wear or damage. Also verify their surrounding frame
work is not cracked, broken or damage. Replace if ANY damage or unsure.

RealSense Module Inspection

Cooling Fan, Sonar, Pin Camera (red)
Front Lens and Pin Camera (red)
Cooling Vents on Back of R/S Module
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents