Completing The Commissioning Process - Miele PDR 507 HP Operating And Installation Instructions

Heat-pump tumble dryer
Table of Contents

Advertisement

The process for setting up a payment
system is described in "Supervisor level
- Payment system".
Completing the commissioning
process
The commissioning process is
completed when a programme lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the  button), the initial
commissioning process can be
completed again. Once a drying
programme has been running for over
20 minutes, the initial commissioning
process cannot be carried out again.
 Turn the programme selector to
 Special programmes.
Timed drying
cool air
Special
Basket
progs
programme
 Touch the  or  sensor until
appears.
drying cool air
 Touch the
Timed drying cool air
Timed drying cool air
0:10
 Touch the  sensor.
Timed
sensor.
0:10
h
Using for the first time
0
Duration
 Touch the  sensor at the top right
until
0:20
appears.
 Touch the
OK
sensor.
 Touch the flashing Start/Stop sensor.
After the programme has finished, the
tumble dryer is ready for use.
:
20
h
OK
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents