3.8 Installation Verification

Table 3-6 Cabinet installation checklist
No.
1
2
Issue 02 (2020-03-17)
After startup, press the EPO buttons in cabinets 1 and 2. The two cabinets should stop.
Check Item
Installation and
securing
Arrangement of
combined
cabinets
Copyright © Huawei Technologies Co., Ltd.
Acceptance criteria
The cabinets are placed in accordance with the design drawing.
The bases are secured.
The adjacent cabinets are neatly arranged and secured with
connecting plates.