Transportation And Unpacking; Installing The Icc Cabinet - Huawei PowerCube 5000 User Manual

Hide thumbs Also See for PowerCube 5000:
Table of Contents

Advertisement

PowerCube 5000
User Manual (SmartLi 100Ah)
Tools and Meters

3.1.4 Transportation and Unpacking

Context
When transporting, carrying, and installing equipment:
Procedure
Step 1 Check the total number of goods against the packing list attached to each packing case.
Step 2 Check the number and types of devices in each packing case against the packing list.
Step 3 Check each packing case.
Step 4 If there is any discrepancy, or the equipment is damaged, report the problem to the local
Huawei office.
To protect the equipment and facilitate future problem diagnosis, store unpacked devices and
packing materials indoors. Take photos of the storage site, any rusty or corroded devices, and
the packing cases and materials. Keep the photos for future reference.
----End

3.2 Installing the ICC Cabinet

Step 1 Mark the position of the cabinet based on the delivered marking-off template.
Issue 02 (2020-03-17)
Table 3-4
lists only the common tools for installation and cable connection. For more dedicated tools
required, see the corresponding component manuals. Prepare tools based on site requirements.
Ensure that components or parts do not collide with objects such as doors, walls, or
shelves.
Wear clean gloves. Do not touch components with bare hands or wet or dirty gloves.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
58

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartli 100ah

Table of Contents