PowerCube 5000
User Manual (SmartLi 100Ah)
3.1 Installation Preparations
3.1.1 Installation Clearances
Reserve sufficient clearances around the ICC cabinet for operation and ventilation:
Reserve at least 800 mm in front of the lithium battery cabinet for ventilation and operation.
3.1.2 Preparing Cables
Table 3-1 Preparing cables for the ICC cabinet
Cable
Cabinet PE cable
RTN+ PE cable
PV DC input power cable
AC input power
cable
AC output power
cable
Issue 02 (2020-03-17)
At least 1000 mm in the front
At least 500 mm at the rear
Live wire
Neutral
wire
PE wire
Live wire
Neutral
wire
PE wire
Copyright © Huawei Technologies Co., Ltd.
3
Maximum
Minimum
Current
Cross-sectio
nal Area
N/A
50 mm
N/A
50 mm
70 A
16 mm
300 A
120 mm
300 A
120 mm
N/A
50 mm
300 A
120 mm
300 A
120 mm
N/A
50 mm
3 Installation
Installation
Maximum
Cross-sectional
Area
2
2
120 mm
2
2
120 mm
2
2
25 mm
2
2
185 mm
2
2
185 mm
2
2
120 mm
2
2
185 mm
2
2
185 mm
2
2
120 mm
55