Cleaning Programme Parameters; Operational Problems - Meiko TopClean Operating Instructions Manual

Multiwasher and disinfection machine for face masks
Table of Contents

Advertisement

15.6 Cleaning programme parameters

Status: 01 August 2016
Cleaning programme
no.:
Chemo-thermal disinfection process
1
2
3
Disinfection procedure with the A
23
27
39
WW = Water change programme
The dosing times are adjusted to the rinse time so that the concentration is maintained
if the rinse time changes.

16 Operational problems

Despite careful construction, minor malfunctions may occur, which are usually easy to fix.
Possible errors and troubleshooting measures for the operator are described in the
following.
Always de-energise the system before carrying out work on the open appliance. To do
this, disconnect the appliance from the power supply, using the locally available main
switch.
If the described operational problems occur repeatedly, the cause must be identified.
Operational problems not described here can generally only be resolved by a
technician or electrician. Please contact your factory representative or authorised
dealer.
Boiler temperature
target value
59
59
59
control system
0
83
83
83
33 / 42
Cleaning time set value
Cleaning
335
515
655
720 (WW)
341
461
341
450 (WW)
Total
360
540
360
480
9742146

Advertisement

Table of Contents
loading

Table of Contents