Chemicals For The Operating The Appliance; Settings For Initial Commissioning By The Service Technician; Commissioning - Meiko TopClean Operating Instructions Manual

Multiwasher and disinfection machine for face masks
Table of Contents

Advertisement

5.8
Only use dosing agents for cleaning or for water softening and final rinsing that have
been approved for use in multi-washers and disinfection devices by MEIKO.
Products approved for chemo-thermal disinfection procedures:
CAUTION!
Rinse aid:
Chemical disinfectant and cleaning agent:
Using unsuitable products can considerably reduce the service life of the dosing units.
Observe the manufacturers' dosing instructions. Disinfectants, cleaning agents and
rinse aids can present a health hazard if they are not used as intended. Observe the
manufacturers' indications on the original containers and safety data sheets.
Items for rinsing are tribologically influenced in particular by chemicals and increased
temperatures during the process, as well as mechanical stresses caused by handling
and transporting.
If a descaling agent is used, please strictly observe the manufacturer's handling and
safety instructions. After such an agent has been used, the product must be completely
removed from the appliance, as even small residues are capable of destroying plastic
parts and sealing materials.
Chemical product settings
The correct settings for the disinfectant and rinse aid depend on the product used. The
relevant chemical supplier can install the correct setting.
6
6.1
In order to avoid injury and death or damage to the installation when commissioning the
appliance, please observe the following points:
Perform any required initial checks on supplied parts. If required, more detailed information
can be found in the relevant operating instructions.
CAUTION!

Chemicals for the operating the appliance

Settings for initial commissioning by the service
technician

Commissioning

The appliance may only be commissioned by suitably qualified individuals
observing the safety instructions.
Before the first start, check to make sure that all tools and foreign parts have been
removed from the appliance.
Make sure that any escaped fluids have been removed.
Activate all safety systems and door switches before commissioning.
Check all bolt fittings for proper seating.
Please also read the section on general safety instructions.
Commissioning and training will be handled and provided by MEIKO-trained
service technicians. The operator must not use the installation before completing
training.
The "Commissioning certificate for GiO modules" must be observed for
appliances equipped with a GiO module and the instructions adhered to
accordingly.
13 / 42
Etol GT500
EW 80 mat, EW 80 systems
Sekumatic FDR, Ecolab
9742146