Meiko GK 60 Operating Instructions Manual
Meiko GK 60 Operating Instructions Manual

Meiko GK 60 Operating Instructions Manual

Salad and vegetable washing machine
Hide thumbs Also See for GK 60:

Advertisement

Operating Instructions

Salad and vegetable washing machine
GK 60
TRANSLATION OF THE "ORIGINAL OPERATING INSTRUCTIONS"
The original operating instructions can be downloaded from: https://partnernet.meiko.de
1/24
9670999
Datei:BA_GK60_9670999_EN_1997-08.doc
Update: 2017-05-04
W e reserv e the right to change execution and construction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GK 60 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Meiko GK 60

  • Page 1: Operating Instructions

    TRANSLATION OF THE "ORIGINAL OPERATING INSTRUCTIONS" The original operating instructions can be downloaded from: https://partnernet.meiko.de 1/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc Update: 2017-05-04 W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 2: Table Of Contents

    16.1 Basic safety measures during normal operation 16.2 Maintenance plan Environmentally acceptable measures, Disposal of the installation Documentation 2/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 3: Introduction And General Information

    Dear Customer, We are delighted about the confidence you have shown in our products. It is very important to us that you should obtain significant use from MEIKO products and that they should make your work easier. If you follow the instructions in this document carefully, your salad and vegetable washing machine will always give you total satisfaction and will have a long service life.
  • Page 4: Description Of The Machine

    Please provide the following information on any query and/or when ordering spare parts: Type: This information can be found on the plate. 4/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 5: Explanation Of The Safety Symbols Used

    Non-potable water: The water is not for drinking. Health can be endangered by drinking. Use in accordance with regulations The salad and vegetable washing machine GK 60 is only is designed to wash salad, fruits and vegetables. DANGER! The salad and vegetable washing machine must be used only in accordance with regulations.
  • Page 6: Ec Declaration Of Conformity

    Costruzione / Jefe de la sección de desarrollo y diseño / Chef Ontwikkeling-Constructie 6/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 7: General Safety Instructions

    - undertaken by unauthorised persons without the written permission of the manufacturer will invalidate the warranty. 7/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 8: Basic Safety Measures

    At the end of operation the machine is to be switched off completely with the on-site power disconnection device. CAUTION! 8/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 9: Delivery, Shipping, Installation And Assembly

    MEIKO. Damaged appliances must not be commissioned. CAUTION! 9/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 10: Transport, Installation And Assembly

    The enclosed technical sheet indicates the connection and consumption ratings of the appliance. An engineer from your local MEIKO Service Centre can install the appliance at the correct point and connect the tables - upon request. An engineer from your local MEIKO Service Centre can install the appliance at the correct point and connect the tables - upon request.
  • Page 11: Requirements For The Electrical Connection

    A dirt trap must be fitted into the fresh water supply to protect the solenoid valve. 11/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 12: Requirements For The Waste Water Connection

    Meiko. The operator may only use the installation after training has been provided. 12/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 13: Operating Panel

    Operating instructions GK 60 Washing with the salad and vegetable washing machine Operating panel 13/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 14: Preparation For Washing

    „2 min.“ are preset. Danger of crushing. Close the cover with both hands. CAUTION! 14/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 15: Operation During Washing

    If rotary heavy baskets, after opening the cover, are braked by hand, danger of injury CAUTION! exists. 15/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 16: Separate Spin Programme

    Open the tank cover. Remove basket carrier. Remove dirt strainer for cleaning. 16/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 17: Care And Maintenance

    Respect the safety rules of the manufacturers on the original packing as well as on the safety data sheets. 17/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 18: Basic Information

    30 cm (distance of the field source to the implant). 18/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 19: Staff Training

    Faults not described here can in general only be eliminated by a technician or electrician. Please contact the agency responsible or the authorised dealer. 19/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 20: Tips For Self-Help In The Case Of Faults

    We recommend that you take out a maintenance contract with our manufacturer’s agent CAUTION! in order to ensure a long service life. 20/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 21: Basic Safety Measures During Normal Operation

    These materials must be stored, shipped, collected and disposed of in suitable containers! 21/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 22: Maintenance Plan

    Check pressure hose position and operation of drain pump 7. Electrical installation 22/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 23: Environmentally Acceptable Measures, Disposal Of The Installation

    Technical data sheet Wiring diagram / Programming instructions Installation regulations - general information 23/24 9670999 Datei:BA_GK60_9670999_EN_1997-08.doc W e reserv e the right to change execution and construction! MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121...
  • Page 26 2016-04-20 (Update) EC Declaration of Conformity / Déclaration de conformité CE / Dichiarazione di conformità CE / Declaración de conformidad CE / CE-conformiteitsverklaring MEIKO Maschinenbau GmbH & Co. KG Firma / Company / Société / Ditta / Empresa / Fabrikant Englerstraße 3...
  • Page 28 Scaricare l'app MEIKO Connect nel App-Store. MEIKO Connect App öffnen und QR-Code scannen. Open the MEIKO Connect app and scan the QR code. Ouvrir l’appli MEIKO Connect et scanner le code. Abrir la aplicación MEIKO Connect y escanear el código QR.

Table of Contents