Removing or moving the cable-management arm: 2145-92F or 2147-92F

You might need to move the cable-management arm (CMA) aside to access components or complete
service tasks. If needed, you can also remove the CMA from the 2145-92F expansion enclosure.
About this task
The cable management arm (CMA) consists of an upper and lower arm assembly, as Figure 64 on page
64 shows. The upper and lower are independent of each other. They can be installed, moved, or
removed from the enclosure individually.
Figure 64. Upper and lower cable-management arms
To complete many service tasks, you can swing the CMA assemblies away from the expansion enclosure.
You do not have to completely remove the CMA assemblies from the enclosure. For these service tasks,
complete step "1" on page 67 through step "4" on page 68 in "Moving the cable management arms"
on page 66.
However, you might need to remove a CMA assembly from the 2145-92F expansion enclosures. To do so,
complete step "1" on page 65 through step "8" on page 66 in following procedure.
Procedure
Remove the upper CMA assembly
The connectors of the CMA are installed on the rail hooks at the end of the support rails. Figure 65 on
page 65 shows the connectors on the upper CMA assembly.