Page 1
English Installation Instruction UNPACKING INSTRUCTIONS Carefully open the carton, remove contents and lay out on cardboard or other protective surface to avoid damage. Check package contents against the Supplied Parts List in the next page to assure that all components were received undamaged. Do not use damaged or defective parts.
Page 2
Supplied Par ts List (1) 35mm Tube (1) Disconnected (2) VESA Plate with (1) Center VESA Gas Spring Arm-c1 Support-a “C” Clamp-b Plate-c2 (2)Add-on Arm-d (2)Wire Cover-e (4)Axis Cover-f (1)Stopper Ring-g (6)M4x6 Bolt-h (4)M6x12 Bolt-i (2)M10x15 Bolt-j (1)Allen Key-k (1)Wrench-l (12)M4 (2)Wire (12)M4x12...
Page 3
Install the “C” Clamp According to the Desktop Thickness Step 1 The depth of “C” clamp can be changed in three positions. Choose the proper depth a c c o r d i n g t o t h e t h i c k n e s s o f y o u r desktop.
Page 4
Step 3 Assemble Two Arms and Wire Cover *The Add-on Arm(d) can be removed as another option if you use stand for the smaller screens on a desk that is against a wall. Install Arm and Center VESA Plate to the Tube Support Step 4 Step 5 Mount the Monitor to VESA Plate...
Page 5
Make Necessary Adjustments, and Run Cables Step 6 Fix Tilt Angle Fix Tilt Angle Adjust the Torque of Gas Spring Step 7 Adjust the torque of gas spring according to the weight of your monitor. If your monitor can not stay in the lower position, turn the grub screw clockwise(-).
Need help?
Do you have a question about the MI-763 and is the answer not in the manual?
Questions and answers