Chapter 3: Installation; Installation; Rack Installation - TP-Link 24+2/24+2G User Manual

24+2/24+2g remote smart switch
Table of Contents

Advertisement

TL-SF2226P+/TL-SL2226P+

Chapter 3: Installation

3.1 Installation

Follow these steps to install the switch:
The surface must support at least 5kg
The power source must be within 1.5m
Check the cable to make sure the connection to AC power
Leave enough space for the ventilation

3.2 Rack Installation

The TL-SF2226P+/TL-SL2226P+ can be mounting in an EIA standard size 19 inches
rack.
1.
Attach a mounting bracket to each side of the TL-SF2226P+ with the screws
provided.
2.
Slide the TL-SF2226P+/TL-SL2226P+ into the Rack.
3.
Use the screws to secure the switch to the Rack.
Figure 3-1 The view of attaching the mount brackets on the TL-SF2226P+
Remote Smart Switch User Guide
- 4 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 24+2/24+2G and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Tl-sf2226pSl2226p+Tl-sf2226p+Tl-sl2226p+

Table of Contents