Download Print this page

KDK M56RG Operating And Instalation Instructions page 5

Advertisement

2
2
Insert Lower Canopy to the Pipe. Then insert Upper Canopy (with logo brand) to the Pipe.
Lower Canopy
Pipe
Check Point After Installation
1. Insert the Lower and Upper Canopy to Pipe and the screw is not tightened.
2. Upper Canopy (with logo brand) is on top of Lower Canopy (no logo brand).
B)
Assemble Pipe To Motor Assembly
1
1
Pull the power cord (from power supply) and insert into the Pipe hole as shown.
(i)
Upper Canopy
(with logo brand)
Power Cord (from power supply)
(ii)
Ceiling
Pipe
Upper Canopy
Lower Canopy
5
Do not screw Lower and
Upper Canopy Screws
Check

Hide quick links:

Advertisement

loading

This manual is also suitable for:

N56rg