Receiving The Machine - Climax LM5200 Operating Manual

Linear milling machine
Table of Contents

Advertisement

Receiving the Machine

The machine was run tested and thoroughly inspected before leaving the factory. When leaving
the factory, the machine is packaged well for the demands of normal transportation. Climax
cannot, however, guarantee the condition upon arrival of the machine.
Inspecting the Shipment
Upon receiving your machine inspect the containers for shipping damage.
Open the containers and inspect the machine for shipping damage.
Check the items you received against the items listed on the invoice.
Contact
components.
Unpacking instructions
When unpacking the machine, take care not to drop or damage the components.
Use lifting eyes or slings to lift the components out of the shipping crate.
Save the shipping crate to store the machine when not in use.
Shipping and Handling Precautions
The containers are designed to be lifted only with the provided lifting
points and with the container fully closed. Do Not lift with the container
covers removed.
Surfaces subject to corrosion were sprayed with a rust preventative prior
to shipment (and possibly wrapped in oil impregnated paper). The user
should exercise caution while handling the components provided since
they may be greasy and/or slippery.
P/N 66188, Rev. 5
IMPORTANT
Climax
immediately
CAUTION
INFORMATION
concerning
damaged
or
missing
Page 31

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LM5200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents