Handling Precautions - Toshiba TOSNIC-7000S Instruction Manual

Toshiba uninterruptible power system instruction manual
Table of Contents

Advertisement

3.

Handling Precautions

Perform daily and periodic inspections as noted in the maintenance and inspection
plan.
In order to ensure a long service life and optimal performance,
the equipment must be installed in a suitable environment, must
be operated correctly, and must be given the proper daily and
periodic inspections. Maintenance and inspections are
particularly effective in preventing accidents caused by changes
in components that will occur over time. Be sure to have
periodic maintenance work and inspections done by Toshiba
service and maintenance personnel.
For more information on servicing programs and fee options,
contact the Toshiba Service Center.
Operate the unit within the ambient conditions noted in the specifications.
Operating the unit outside these ranges may result in failure.
During operation, do not turn off the air conditioner for the UPS chamber and the
battery chamber.
This will cause the temperature in these chambers to rise and may result in failure.
When starting or stopping the equipment, monitor the operation on the graphic
display panel LCD and follow the procedures described in Chapter 8 "Operation".
Operating the unit in other than the prescribed manner may result in failure.
*
The startup and stop procedures presented in this instruction
manual are the operating procedures for independent UPS nits.
For system-wide operating procedures for when other
distribution panels are present, refer to the corresponding
operating procedures manual.
- 7 -
6 F 3 H 1 0 0 1
PROHIBITED

Advertisement

Table of Contents
loading

Table of Contents