Toshiba Tecra M1 Maintenance Manual page 155

Personal computer
Hide thumbs Also See for Tecra M1:
Table of Contents

Advertisement

3.10 Async Test
NOTE: To execute this subtest, two machines must be connected with an
RS-232C direct cable. One machine should be set as "send"(subtest 02)
and the other set as "receive" (subtest 03). The wiring diagram for the
RS-232C direct cable is described in Appendix F.
This subtest sends 20h through 7Eh data to the receive side, then receives the sent
data and compares it to the original data.
Subtest 03
Point to Point (receive)
This subtest is used with subtest 02 described above. This subtest receives the data
from the send side, then sends the received data.
Subtest 04
Interrupt Test
This subtest checks the Interrupt Request Level of IRQ 4, 3 and 5 from the send
side.
Subtest 06
FIR/SIR Point to Point (send)
NOTE: To execute subtests 06 and 07, each computer must have access
to the other computer's infrared port.
This subtest sends 20h through 7Eh data to the receive side, then receives the sent
data and compares it to the original data through the FIR/SIR port.
Subtest 07
FIR/SIR Point to Point (receive)
This subtest is used with subtest 06 described above. This subtest receives the data
from the send side, then sends the received data through the FIR/SIR port.
TECRA M1 Maintenance Manual (960-436)
3 Tests and Diagnostics
3-29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents